PROJECT

West Lake Development

Hand sawing and Chain sawing Top portion of structural wall for crane removal.

Location

Westlake, FL

Client

Yukon Construction INC

Challenges:

Caught in Between, Falls, Struck byes.

Solution:

All PPE worn is a must! Proper set up of Scaffolding to prevent falls and ensure operator and helper are at a safe distance from a Leaning Edge. 1st cuts were made from the backside, allowing proper rigging for the Crane on site. 2nd cuts were made on Scaffolding, allowing pieces to be Removed/ Flown away from the Operator/ helper and stockpiled to ground for contractor’s removal.

Outcome:

All pieces were successfully cut and removed, with no accidents, injuries, or incidents. Another satisfied Customer!

More Project Images