Hand sawing 2’ft x 2’ft x 6” deep pilings for bridge construction
PROJECT
Hialeah Bridge Project
Location
Hialeah Gardens and Okeechobee Road
Client
Prince Contracting LLC- Sr25
Challenges:
Caught in Between Struck byes
Solution:
All PPE worn is a must! Proper use of equipment Caught in Between hazards. Once the rigging was properly done, on an Aerial lift, the operator cut pilings, allowing the crane to “Swing” and stockpile away from the work area. The same process took place if the operator cut pilings @ ground level.
Outcome:
All pieces were successfully cut and removed without accidents, injuries, or incidents. Another satisfied Customer!!!